Home > Case Studies

Solar Installation Case Studies

Solar Installation Case Studies — Real Projects by Ezee Control
  • Real addresses
  • Real equipment
  • Verified Before/After Bills
  • No composite examples
  • No invented numbers

Completed Case Studies

Residential Homes Installed

Mosques Solarized

Schools Powered

Completed Solar Installations

Project 01
ON-GRID

10.44kW On-Grid Solar | Madina Colony, Gujranwala

Madina Colony, DC Road, Gujranwala

Result: PKR 45,000 monthly GEPCO bill reduced to nil. Net billing approved. Surplus units credited to grid.
This was a high-consumption residential property on DC Road in Madina Colony. The client was paying PKR 45,000 per month on GEPCO bills before installation. The roof required a customised elevated mounting structure due to the roof angle and shading conditions on one side. The Solis S5 on-grid inverter was selected for its compatibility with GEPCO net billing approval requirements. After commissioning and net billing approval, the monthly bill dropped to nil with surplus units credited back to the grid at the national average energy purchase rate.

System Size
10.44kW PV
Inverter
Solis S5 Series On-Grid
Solar Panels
LONGi Hi-MO X6 (Mono PERC)
Mounting Type
Customised Elevated
Before Bill
PKR 45,000 / mo
After Bill
Nil / Credit
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 05
HYBRID

8kW Single Phase Hybrid | Residential, Y Block Peoples Colony

Y Block, near Takbeer Masjid, Peoples Colony, Gujranwala

Result: Monthly GEPCO bill reduced from PKR 55,000 to PKR 10,000. Approximately 83% bill reduction. Battery backup for load shedding.
This residential property in Y Block, Peoples Colony was paying between PKR 55,000 and PKR 60,000 per month on GEPCO bills with regular load shedding disruption. The client required both bill reduction and backup power. A single phase hybrid system was configured without a net billing application as the client preferred to retain grid connection for heavy evening loads rather than pursue surplus export. The elevated mounting was required due to roof structure. After commissioning, the monthly bill reduced from PKR 55,000 to 60,000 down to PKR 10,000, a reduction of approximately 83%. Battery backup covers load shedding periods.
System Size
8kW PV
Inverter
Solis S6 8kW Hybrid
Solar Panels
Pylontech Fidus (5.12kWh)
Mounting Type
Not Configured
Before Bill
PKR 55k - 60k
After Bill
PKR 10,000 / mo
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 02
OFF-GRID

10.44kW On-Grid Solar | Madina Colony, Gujranwala

Jalil Town, Gujranwala

Result: PKR 35,000 monthly GEPCO bill reduced to nil. Mosque fully off-grid. No load shedding impact.
Jamia Masjid Mumtaz Shaukat in Jalil Town had a monthly GEPCO bill of PKR 35,000 and significant load shedding exposure. An off-grid configuration was selected to make the mosque fully independent from the grid, removing both the electricity bill and the impact of outages entirely. The Dyness DL 5.0 LiFePO4 battery bank was sized to cover evening and night load requirements after solar generation drops. The elevated mounting was required due to the mosque roof structure. After commissioning the electricity bill dropped to nil. The mosque now operates entirely on solar and battery power.
System Size
10kW PV
Inverter
GoodWe 8kW Single Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 (Mono PERC)
Mounting Type
Customised Elevated Mounting
Before Bill
PKR 35,000 / month
After Bill
Nil / Credit
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 03
3-Phase Hybrid

15.66kW 3-Phase Hybrid | Jamia Masjid Noor e Hidayat, Peoples Colony

X Block Main Market, Peoples Colony, Gujranwala

Result: PKR 60,000 monthly GEPCO bill converted to net billing credit. 3-phase hybrid commissioned. GEPCO net billing approved.
Jamia Masjid Noor e Hidayat is a large mosque in X Block, Peoples Colony with a 3-phase commercial connection and a monthly GEPCO bill of PKR 60,000. The project required a 3-phase hybrid system design to match the existing electrical infrastructure. The Solis S6 15kW 3-phase hybrid inverter was selected for its compatibility with 3-phase GEPCO connections and net billing approval under the NEPRA Prosumer framework. After commissioning, the monthly bill converted from PKR 60,000 to a net billing credit position, meaning the mosque now generates more units than it consumes on an annual average basis. This project established EzeeControl's capability on large 3-phase hybrid mosque installations.
System Size
15.66kW PV

Inverter
Solis S6 Series 15kW 3-Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 Series (Mono PERC)
Mounting Type
Customised Elevated Mounting
Before Bill
PKR 60,000 / month
After Bill
Nil / Credit
Battery
Pylontech Fidus LiFePO4 5.12kWh
Installed
August 2025
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 04
3-Phase Hybrid

10.44kW 3-Phase Hybrid | Iqra Hufaz lil-Banaat School, Satellite Town

Satellite Town, opposite Jamia Khursheed, Gujranwala

Result: Electricity cost reduced by 90%. Diesel generator dependency removed. Zero export mode. No net billing application required.
Iqra Hufaz lil-Banaat School in Satellite Town had two significant problems before the installation: a GEPCO bill of PKR 60,000 per month and dependence on an ageing diesel generator for power backup during load shedding. The generator required ongoing diesel costs, frequent maintenance and created operational disruption during examination periods. The school's annual electricity consumption was approximately 8,000 kWh. A 3-phase hybrid system in zero export mode was configured, meaning all solar generation is consumed on-site without export to the grid. This eliminated the need for a net billing application while still delivering the bill reduction and backup benefit. After commissioning, electricity costs were reduced by 90% and diesel generator dependence was removed entirely.
System Size
10.44kW PV
Inverter
Solis S6 Series 12kW 3-Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 Series (Mono PERC)
Mounting Type
Standard L2 Mounting
Before Bill
PKR 60,000 / month + Generator Cost
After Bill
PKR credit amount electricity cost reduced by 90%
Battery
Pylontech Fidus LiFePO4 5.12kWh
Installed
March 2026
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 01
ON-GRID

10.44kW On-Grid Solar | Madina Colony, Gujranwala

Madina Colony, DC Road, Gujranwala

Result: PKR 45,000 monthly GEPCO bill reduced to nil. Net billing approved. Surplus units credited to grid.
This was a high-consumption residential property on DC Road in Madina Colony. The client was paying PKR 45,000 per month on GEPCO bills before installation. The roof required a customised elevated mounting structure due to the roof angle and shading conditions on one side. The Solis S5 on-grid inverter was selected for its compatibility with GEPCO net billing approval requirements. After commissioning and net billing approval, the monthly bill dropped to nil with surplus units credited back to the grid at the national average energy purchase rate.

System Size
10.44kW PV
Inverter
Solis S5 Series On-Grid
Solar Panels
LONGi Hi-MO X6 (Mono PERC)
Mounting Type
Customised Elevated
Before Bill
PKR 45,000 / mo
After Bill
Nil / Credit
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 03
3-Phase Hybrid

15.66kW 3-Phase Hybrid | Jamia Masjid Noor e Hidayat, Peoples Colony

X Block Main Market, Peoples Colony, Gujranwala

Result: PKR 60,000 monthly GEPCO bill converted to net billing credit. 3-phase hybrid commissioned. GEPCO net billing approved.
Jamia Masjid Noor e Hidayat is a large mosque in X Block, Peoples Colony with a 3-phase commercial connection and a monthly GEPCO bill of PKR 60,000. The project required a 3-phase hybrid system design to match the existing electrical infrastructure. The Solis S6 15kW 3-phase hybrid inverter was selected for its compatibility with 3-phase GEPCO connections and net billing approval under the NEPRA Prosumer framework. After commissioning, the monthly bill converted from PKR 60,000 to a net billing credit position, meaning the mosque now generates more units than it consumes on an annual average basis. This project established EzeeControl's capability on large 3-phase hybrid mosque installations.
System Size
15.66kW PV

Inverter
Solis S6 Series 15kW 3-Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 Series (Mono PERC)
Mounting Type
Customised Elevated Mounting
Before Bill
PKR 60,000 / month
After Bill
Nil / Credit
Battery
Pylontech Fidus LiFePO4 5.12kWh
Installed
August 2025
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
Project 04
3-Phase Hybrid

10.44kW 3-Phase Hybrid | Iqra Hufaz lil-Banaat School, Satellite Town

Satellite Town, opposite Jamia Khursheed, Gujranwala

Result: Electricity cost reduced by 90%. Diesel generator dependency removed. Zero export mode. No net billing application required.
Iqra Hufaz lil-Banaat School in Satellite Town had two significant problems before the installation: a GEPCO bill of PKR 60,000 per month and dependence on an ageing diesel generator for power backup during load shedding. The generator required ongoing diesel costs, frequent maintenance and created operational disruption during examination periods. The school's annual electricity consumption was approximately 8,000 kWh. A 3-phase hybrid system in zero export mode was configured, meaning all solar generation is consumed on-site without export to the grid. This eliminated the need for a net billing application while still delivering the bill reduction and backup benefit. After commissioning, electricity costs were reduced by 90% and diesel generator dependence was removed entirely.
System Size
10.44kW PV
Inverter
Solis S6 Series 12kW 3-Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 Series (Mono PERC)
Mounting Type
Standard L2 Mounting
Before Bill
PKR 60,000 / month + Generator Cost
After Bill
PKR credit amount electricity cost reduced by 90%
Battery
Pylontech Fidus LiFePO4 5.12kWh
Installed
March 2026
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control

We often send out our newsletter with news and great offers. We will never disclose your data to third parties and you can unsubscribe from the newsletter at any time.

Unfortunately, we’re unable to offer free samples. As a retailer, we buy all magazines from their publishers at the regular trade price. However, you could contact the magazine’s publisher directly to ask if they can send you a free copy.

You can create a new account at the end of the order process or on the following page. You can view all of your orders and subscriptions in your customer account. You can also change your addresses and your password.

No, you don’t have to create an account. But there are a few advantages if you create an account.

  • You never have to enter your billing and shipping address again

  • Find all of your orders, subscriptions and addresses in your account

  • Download invoices of your orders

No, we don’t have a physical store location at the moment. We accept only orders through our online shop and we’re shipping all orders with the Swiss Post Service. Please visit our shipping section for more details.

From time to time you will find us at design fairs and popup markets in Switzerland. Subscribe to our newsletter and you’ll receive the latest news.

Tab Content

Project 02
OFF-GRID

10.44kW On-Grid Solar | Madina Colony, Gujranwala

Jalil Town, Gujranwala

Result: PKR 35,000 monthly GEPCO bill reduced to nil. Mosque fully off-grid. No load shedding impact.
Jamia Masjid Mumtaz Shaukat in Jalil Town had a monthly GEPCO bill of PKR 35,000 and significant load shedding exposure. An off-grid configuration was selected to make the mosque fully independent from the grid, removing both the electricity bill and the impact of outages entirely. The Dyness DL 5.0 LiFePO4 battery bank was sized to cover evening and night load requirements after solar generation drops. The elevated mounting was required due to the mosque roof structure. After commissioning the electricity bill dropped to nil. The mosque now operates entirely on solar and battery power.
System Size
10kW PV
Inverter
GoodWe 8kW Single Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 (Mono PERC)
Mounting Type
Customised Elevated Mounting
Before Bill
PKR 35,000 / month
After Bill
Nil / Credit
10.44kW on-grid solar installation at a residential property in Madina Colony DC Road Gujranwala by Ezee Control
This is a basic text element.

Tab Content

Project 02
OFF-GRID

10.44kW On-Grid Solar | Madina Colony, Gujranwala

Jalil Town, Gujranwala

Result: PKR 35,000 monthly GEPCO bill reduced to nil. Mosque fully off-grid. No load shedding impact.
Jamia Masjid Mumtaz Shaukat in Jalil Town had a monthly GEPCO bill of PKR 35,000 and significant load shedding exposure. An off-grid configuration was selected to make the mosque fully independent from the grid, removing both the electricity bill and the impact of outages entirely. The Dyness DL 5.0 LiFePO4 battery bank was sized to cover evening and night load requirements after solar generation drops. The elevated mounting was required due to the mosque roof structure. After commissioning the electricity bill dropped to nil. The mosque now operates entirely on solar and battery power.
System Size
10kW PV
Inverter
GoodWe 8kW Single Phase Hybrid Inverter
Solar Panels
LONGi Hi-MO X6 (Mono PERC)
Mounting Type
Customised Elevated Mounting
Before Bill
PKR 35,000 / month
After Bill
Nil / Credit
This is a basic text element.

Tab Content

This is a basic text element.

What These Five Projects Demonstrate

3-Phase Capability Is Confirmed

Three of the five projects involved 3-phase hybrid systems. The Solis S6 3-phase inverter was installed in two mosque projects and one school project. If you have a commercial or institutional building with a 3-phase GEPCO connection, these projects confirm that our team has done it before and can handle the engineering requirements.

Elevated Mounting Is Standard Practice

Four of the five installations used customised elevated mounting structures rather than standard L-foot mounting. Most roof types in Gujranwala, including RCC flat roofs and mosque domes, require elevated mounting to achieve the right tilt angle and avoid shading from parapets and water tanks. We design mounting to suit each roof rather than using a one-size-fits-all approach.

Results Are Specific and Verifiable

Every bill figure on this page comes directly from the client intake data provided by the customer before and after installation. We do not publish estimated savings ranges. The numbers above are what actually happened on these specific projects. Your results will depend on your own consumption pattern, roof orientation and system size, which is why we carry out a site survey before quoting.

LONGi Hi-MO X6 Used Across All Projects

All five installations used LONGi Hi-MO X6 Mono PERC panels. This is not coincidence. We tested and selected this panel as our primary product based on performance data, warranty terms and local availability of authentic stock. Counterfeit solar panels are a real problem in the Pakistan market. We source directly through verified supply chains.

What Our Customers Say

Verified Feedback Compilation Underway

Reviews from our customers are coming. We will publish real feedback from verified customers only. No names or words invented.
© 2026 Ezee Control Private Limited. All rights reserved. Registered with SECP & FBR.
Headquarters: Citi Housing Society, Gujranwala, Punjab, Pakistan.
Call Expert:
+92 339 6000105
WhatsApp Blueprint:
+92 339 6000105