Home > Services

Solar System Installation in Gujranwala

Ezee Control is based in Citi Housing Society, Gujranwala. We install on-grid, hybrid and off-grid solar systems for homes, schools, mosques and businesses across the city.
5 Completed Projects:
Proven solar installations across residential zones, schools, and local mosques.
Registered Office:
Located at 169D Phase II Commercial Market, Citi Housing Society, Gujranwala.
GEPCO Net Billing:
Complete support handled swiftly through our premium AEDB-licensed partner.
Free Site Survey:
Available anywhere in Gujranwala with absolute zero financial obligation.
Timings & Reach:
Saturday to Thursday (9:00 AM to 5:00 PM). Direct Call/WhatsApp: +92 339 6000105.

GEPCO Solar in Gujranwala: What Changed in 2026

Gujranwala falls under the GEPCO (Gujranwala Electric Power Company) distribution zone. If you are installing solar in Gujranwala, your grid connection, net billing application and electricity billing are all handled through GEPCO. What changed in 2026 is important before you decide on system sizing.

Net Billing Has Replaced Net Metering

NEPRA notified the Distributed Generation and Net Billing Regulations 2026 on February 9, 2026. All new solar connections to the GEPCO grid from that date are governed by net billing, not net metering. Under net billing, GEPCO purchases any surplus electricity you export to the grid at the national average energy purchase price, currently approximately PKR 11 per unit. You pay the standard consumer tariff when importing from GEPCO, currently PKR 40 to 50 or more depending on your consumption slab.

System sizing for Gujranwala customers needs to account for this. A system sized to match your daytime consumption returns significantly more value than an oversized system designed to export surplus at the lower buyback rate. We design every new installation around self-consumption first.

Existing GEPCO Net Metering Contracts

If you already have a GEPCO net metering approval from before February 9, 2026, your contract remains valid under the old terms until it expires. Two of our completed Gujranwala installations: the Madina Colony residential project and the Peoples Colony mosque project, both received GEPCO net metering approval before the regulation change. Both remain on the original terms.

GEPCO Connection Types and System Design

If you already have a GEPCO net metering approval from before February 9, 2026, your contract remains valid under the old terms until it expires. Two of our completed Gujranwala installations: the Madina Colony residential project and the Peoples Colony mosque project, both received GEPCO net metering approval before the regulation change. Both remain on the original terms.

GEPCO Net Billing Application in Gujranwala

Ezee Control processes GEPCO net billing applications through our third-party AEDB-licensed partner. We coordinate the documentation, AEDB submission, GEPCO inspection and bidirectional meter installation on your behalf. The process typically takes 6 to 10 weeks after system commissioning.
To view our complete operational guide, explore our documentation on the full GEPCO net billing application process.

Gujranwala Solar Fact: Under net billing, every unit of solar electricity consumed directly in your property saves you PKR 40 to 50 or more. Every unit exported earns approximately PKR 11. Self-consumption is now 3 to 4 times more valuable than export for Gujranwala GEPCO customers.

What Makes Gujranwala Different for Solar

Gujranwala is one of Pakistan's major industrial cities. That matters directly for solar.

Industrial Dust and Panel Cleaning Frequency

Gujranwala's steel, textile, ceramics and light engineering industries produce significant particulate in the air. Panels accumulate dust faster here than in cleaner cities. In the April to June period before monsoon, when wind is low and humidity is high, dust settles on panels continuously. A thin but consistent dust layer reduces panel output by 10 to 20 percent.

For Gujranwala installations, we recommend cleaning panels every 3 to 4 weeks between April and September. Use a soft brush and clean water. Clean in the early morning when panels are cool. Cleaning panels regularly protects your investment more than anything else after installation.

Load Shedding Pattern in Gujranwala

Load shedding in Gujranwala varies by area and season. Central urban areas typically experience 4 to 8 hours of load shedding per day in summer. Areas on the outskirts and in industrial belts can experience longer schedules. For most Gujranwala homes and businesses, a battery bank sized for 4 to 6 hours covers the typical daily outage.

For properties where continuity is critical, clinics, schools during exams, factories on production deadlines, we size the battery to cover the maximum expected daily outage, not just the average.

Roof Types in Gujranwala

Most properties in Gujranwala have RCC flat roofs. Flat roofs require elevated mounting structures to achieve the correct tilt angle, typically 25 to 30 degrees for optimal annual generation in Punjab. Four of our five completed Gujranwala installations used customised elevated mounting structures. This is standard in Gujranwala. We include it in every proposal.

Water tank placement, parapet height and AC outdoor units are the most common shading sources on Gujranwala flat roofs. We map these during the site survey and position panels to minimise shading losses.

GT Road and Sialkot Road Industrial Belt

The GT Road and Sialkot Road corridors in Gujranwala have a high concentration of factories, workshops, plazas and commercial buildings on 3-phase GEPCO connections with large sanctioned loads. These properties typically have significant roof space, high daytime electricity consumption and strong financial cases for commercial solar. We assess 3-phase commercial projects for these areas after reviewing the electricity bill, connection type and roof space.

5 Completed Solar Installations in Gujranwala

Every installation below was completed by our team at a real property in Gujranwala. These are not estimates or case studies from other cities.

Madina Colony, DC Road

10.44kW On-Grid System
01
Result: PKR 45,000 monthly bill reduced to nil.

Residential property utilizing Solis S5 inverter, LONGi Hi-MO X6 panels, and custom elevated structure. GEPCO net metering approved January 2025.

Jalil Town

10kW Off-Grid Mosque System
Result: PKR 35,000 monthly bill eliminated entirely.

Jamia Masjid Mumtaz Shaukat. Built with GoodWe 8kW inverter, Dyness DL 5.0 LiFePO4 battery storage, and LONGi arrays. Fully independent power loop. May 2025.
02

Peoples Colony, X Block

15.66kW 3-Phase Hybrid System
Result: PKR 60,000 monthly bill transformed to credit.

Jamia Masjid Noor e Hidayat. Outfitted with Solis S6 15kW 3-phase hybrid inverter, Pylontech Fidus battery bank, and elevated mounts. Approved August 2025.
03

Satellite Town

10.44kW 3-Phase Hybrid School Setup
04
Result: Cost reduced by 90%; Generator completely eliminated.

Iqra Hufaz lil-Banaat School. Features Solis S6 12kW 3-phase inverter, Pylontech Fidus battery bank operating in strict Zero Export mode. March 2026.

Peoples Colony, Y Block

8kW Single Phase Hybrid System
Result: Dropped monthly bill from PKR 55,000 to PKR 10,000.

Residential property situated near Takbeer Masjid. Installed with Solis S6 8kW inverter unit and Pylontech Fidus lithium backup modules. March 2026.
05
For comprehensive system specifications, performance data and real-time photos, you can see full project specifications.

Areas We Serve in Gujranwala

We carry out free site surveys and installations across all major areas of Gujranwala. Our office in Citi Housing Society means we can reach most parts of the city the same or next day.

Citi Housing Society

Our registered office is at 169D Phase II Commercial Market, Citi Housing Society, Gujranwala 52250. We know the area's GEPCO connection types, roof structures and load patterns from daily operation here. Walk-in consultations welcome during office hours. Residential and commercial solar installations carried out throughout Citi Housing Phase I, Phase II and Phase III.

Satellite Town

Our completed installation at Iqra Hufaz lil-Banaat School in Satellite Town, opposite Jamia Khursheed, demonstrates our capability for institutional 3-phase hybrid systems in this area. The school's electricity cost was reduced by 90 percent and diesel generator dependency was eliminated entirely. Satellite Town has a mix of residential and institutional properties. We serve both.

Peoples Colony

Two of our five completed Gujranwala installations are in Peoples Colony. Jamia Masjid Noor e Hidayat in X Block Main Market received a 15.66kW 3-phase hybrid system. A residential property in Y Block near Takbeer Masjid received an 8kW single phase hybrid system. We know the connection types and typical roof conditions in this area.

Madina Colony and DC Road

Our first completed installation was a 10.44kW on-grid system at a residential property on DC Road in Madina Colony. The monthly GEPCO bill was reduced from PKR 45,000 to nil after net metering approval. Madina Colony and the DC Road corridor are residential areas with typical single phase GEPCO connections.

Jalil Town

Jamia Masjid Mumtaz Shaukat in Jalil Town received our first off-grid installation: a 10kW system that eliminated the mosque's PKR 35,000 monthly electricity bill entirely. The mosque now operates fully off-grid. Jalil Town has a mix of residential properties and mosques that we serve for both grid-connected and off-grid installations.

Wapda Town, Model Town, Garden Town & Civil Lines

We carry out site surveys and installations in Wapda Town, Model Town, Garden Town, Civil Lines and surrounding residential areas. These areas have predominantly single phase residential connections with standard RCC flat roofs suited to elevated mounting structures. Contact us for a free site survey.

GT Road and Sialkot Road Industrial and Commercial Belt

Factories, workshops, plazas and commercial buildings on the GT Road and Sialkot Road belts are mostly on 3-phase GEPCO connections with large sanctioned loads and good roof space. Strong candidates for commercial solar. We assess these projects after reviewing the electricity bill and load details. Send your bill on WhatsApp for an initial assessment.

Which Solar System Is Right for Your Gujranwala Property

Different properties require different technical solutions depending on grid performance, available space, and load profiles.
System Configuration
Target Architecture & Local Alignment
Hybrid Solar System
The most popular choice for Gujranwala homes and businesses. Reduces your GEPCO bill and keeps selected loads running during the 4 to 8 hour daily outages that most Gujranwala areas experience. Three of our five completed Gujranwala installations were hybrid systems. Explore options for hybrid solar system installation.
On-Grid Solar System
Best for Gujranwala properties where load shedding is minimal or backup is not a priority. Lowest upfront cost. Surplus generation credited under GEPCO net billing. Under net billing 2026, a system sized to your daytime consumption returns more value than an oversized system. See details on on-grid solar system installation.
Off-Grid Solar System
For mosques, farms and properties in Gujranwala where grid supply is weak or the electricity bill justifies complete independence. Our Jalil Town mosque installation demonstrates this. PKR 35,000 monthly bill eliminated with no grid connection required. Review custom off-grid solar system installation.
Commercial Solar
Schools, mosques, plazas, offices and factories across Gujranwala. Three-phase systems available. Our Peoples Colony mosque and Satellite Town school installations confirm our 3-phase commercial capability in Gujranwala. Learn more about commercial solar installation.

Gujranwala Solar Questions

Different properties require different technical solutions depending on grid performance, available space, and load profiles.

How much does solar installation cost in Gujranwala?

System cost in Gujranwala depends on system size, type (on-grid, hybrid or off-grid), inverter brand and whether a battery is included. A 5kW hybrid system typically starts from PKR 600,000 to 800,000 depending on battery capacity and equipment specification. A 10kW hybrid system is typically in the range of PKR 1,100,000 to 1,400,000. Final pricing is confirmed after a free site survey and load review. Ezee Control fixes the price in writing before any work begins.

Which areas of Gujranwala does Ezee Control serve?

We serve all major areas of Gujranwala including Citi Housing Society, Satellite Town, Peoples Colony, Madina Colony, Jalil Town, Wapda Town, Model Town, Garden Town, Civil Lines, Sheikhupura Road belt and the GT Road and Sialkot Road commercial and industrial belts. Our office is in Citi Housing Society. Call or WhatsApp to confirm availability for your specific area.

Does Ezee Control have a physical office in Gujranwala?

Yes. Ezee Control Private Limited is registered and operates from 169D Phase II Commercial Market, Citi Housing Society, Gujranwala 52250. Walk-in consultations are welcome during office hours: Saturday to Thursday 9am to 5pm. Friday closed. We are not a remote or travelling operation.

How does GEPCO net billing work for Gujranwala solar owners?

Under the NEPRA Prosumer Regulations 2026, GEPCO purchases surplus solar generation exported to the grid at the national average energy purchase price, currently approximately PKR 11 per unit. You continue to pay the standard GEPCO consumer tariff for units imported from the grid. Ezee Control processes net billing applications through our AEDB-licensed partner. The process takes approximately 6 to 10 weeks after commissioning.

How many hours of load shedding backup does a hybrid system provide in Gujranwala?

Backup duration depends on battery capacity and the loads running during the outage. For a typical Gujranwala home with a 2kW backup load including ceiling fans, LED lights, a refrigerator and router. A single 5.12kWh LiFePO4 battery provides 4 to 6 hours of backup. This covers most daily outage windows in Gujranwala urban areas. We calculate the exact backup duration from your appliance list during the site survey.

How long does solar installation take in Gujranwala?

A residential system up to 8kW is typically completed in 3 to 4 days. Larger 3-phase commercial systems for schools and mosques take 5 to 7 days depending on roof complexity. Our team is based in Gujranwala. No travel delays.. We confirm the timeline in the written proposal before work begins.

Does Ezee Control service solar systems installed by other companies in Gujranwala?

Yes. We carry out maintenance visits, fault diagnosis and written technical audits for solar systems installed by any company in Gujranwala. If your system is underperforming or showing a fault, contact us with a description of the problem or a photo of the inverter display. We will advise on next steps.

Book a Free Site Survey in Gujranwala

Our team is based in Citi Housing Society. We can visit your property the same day or next day in most Gujranwala areas. Send your latest GEPCO bill on WhatsApp and we will tell you what size system suits your consumption before we visit. No charge. No obligation until you sign a written proposal.
© 2026 Ezee Control Private Limited. All rights reserved. Registered with SECP & FBR.
Headquarters: Citi Housing Society, Gujranwala, Punjab, Pakistan.
Call Expert:
+92 339 6000105
WhatsApp Blueprint:
+92 339 6000105